Home / Changelog
Changelog · Release notes
Changelog
We keep refining every detail. Here is a record of each update, so you always know what has improved.
New features keep arriving under the same version number — just update the app.
v1.1.52026.10.12
Home screen widget refreshes every morningLatest
- NewThe home screen widget fetches your latest data once early each morning, so your to-dos and schedule are up to date when you pick up your phone, no need to open the app first
- ImprovedAfter midnight, the widget switches to the new day on its own: today's and this week's to-dos move forward
- ImprovedSmaller Android app, uses less storage
- FixedPerformance and stability improvements
v1.1.42026.10.02
Mark up QC photos, better Google Calendar sync
- NewMark up QC photos: draw with a pen, highlighter, box, circle, line or arrow to point out the issue, pinch to zoom for detail, and the original photo is kept How to use →
- NewBetter Google Calendar sync: shared and subscribed calendars show up too, and you can pick which calendars to show from the Calendar tab, each in its Google color How to use →
- ImprovedScheduling: today is highlighted on the Gantt chart, common trades add with one tap, shift a whole stretch of work days with one-tap undo, and simultaneous edits are all kept
- ImprovedPetty cash: record income and attach receipt photos, faster typing and reconciling in busy months, clearer payroll and export columns
- ImprovedCheck-in: managers can add missing punches (including weekend work), leave and overtime can be cancelled or edited, and monthly reports add leave, overtime and missed-punch columns
- ImprovedSites: material confirmations record who confirmed and when, to-dos are sorted by date so overdue items stand out, and site rules can be copied from another site
- FixedMany fixes for a faster, more stable app
v1.1.32026.09.28 · update
Month-end pay, worked out from check-ins
- NewNew Payroll tab in the Company ledger under Expense Tracking: each person's statement is built from the month's check-ins, showing days worked, regular hours and overtime How to use →
- NewPay settings: set each person to monthly, daily or hourly pay. Overtime rates default to Taiwan labor law (first 2 hours ×1.34, after that ×1.67) and can be changed How to use →
- NewAdditions and deductions such as a perfect-attendance bonus, travel allowance or pay advance, as a fixed amount or per day × days worked How to use →
- NewStaff claims: expenses staff record in the Company ledger are marked "Pending claim" and added to their statement once reconciled How to use →
- NewWhen it all checks out, tap "✓ Mark Finalized" to lock the numbers and mark the claims as paid out in that month's payroll. You can undo it if needed How to use →
- NewExport statements to Excel or PDF for your accountant; the PDF includes a signature line How to use →
- ImprovedDays without a check-out are flagged "Incomplete", so you know which days to fix before month-end
- ImprovedOnly admins and people with the payroll permission (e.g. your accountant) can see it
v1.1.32026.09.24 · update
Jot down todos before the date is set, and mark them Pending
- NewTodos now have a confirmation status: mark them Pending or Confirmed, just like material confirmations How to use →
- NewThe date can wait: tap × next to the date to clear it. Todos without a date gather under "No date yet" at the top of the Todos page, so nothing gets lost How to use →
- NewAdd the date once it's set and the todo moves to that day; on a site's todo list, tap the tag on the right to switch its status How to use →
- ImprovedThe Todos page now asks before deleting, to prevent accidents
v1.1.32026.09.16 · update
Finished sites tucked away; invite colleagues with one link
- NewMark as completed: when a site is done, tap "⋯" on its card in Overview and mark it completed — it moves to the "Completed" section at the bottom instead of sitting in the way How to use →
- NewThe Completed section stays collapsed until you tap it; "View" opens the site with every photo, QC item, expense and check-in intact, and you can reopen it anytime How to use →
- ImprovedCompleted sites no longer appear in the site pickers for scheduling, check-in and todos
- ImprovedDeleting a site now happens from the Completed section and is limited to admins, to prevent accidental deletion
- NewInvite by link: User Management now has "Invite by link (LINE)" — send the link, your colleague installs the app, enters a name and mobile number, and they're in. No need to create the account for them first How to use →
- NewNew "3 steps to get going" card on the home screen (admins only): add your first site, invite a colleague, colleague checks in once — the card goes away when all three are done How to use →
- FixedClear sample data: if you had edited the schedule before clearing, sample sites stayed in the schedule; they are now removed too, and sites you created are untouched
v1.1.32026.08.23 · update
Sign quotes and contracts on your phone and send them straight back
- NewDocument signing: keep quotes and contracts in one place, sign by hand and send them back — no printing and scanning How to use →
- NewPhoto to signature: photograph a signature on paper, the background is removed automatically and it can be reused How to use →
- NewMerge and split PDFs — combine several files into one, or cut a long file into parts How to use →
- NewExport documents as PDF, JPG or plain text, with optional compression and password How to use →
- ImprovedDocuments are visible only to the person who created them, not to colleagues
- NewSave to Photos: save one photo or a selected batch to your phone in one tap How to use →
- ImprovedRedesigned Apple Watch face view: all-day events pinned to the top, Google Calendar events included
- ImprovedPhotos are compressed before upload — faster and lighter on data
v1.1.22026.08.18
Filling in the details that matter on site
- NewConstruction standards tab — each project’s specifications in one place, available to crew on site How to use →
- NewSite photos organised by month and trade, with one-tap download of a whole project How to use →
- NewSelect multiple site photos to download as a bundle or delete in one go How to use →
- NewShift a whole Gantt chart at once when work is delayed, with the option to skip weekends How to use →
- NewClear an entire schedule with one tap and start again faster How to use →
- ImprovedConsistent gestures across every list: long-press to reorder, swipe to delete, tap the circle to complete
- ImprovedProjects can be renamed, with related records updated automatically
- FixedFixed “today” showing the previous day during the early hours
v1.1.12026.08.01
No more assembling month-end paperwork by hand
- NewRedesigned monthly attendance report — absences clearly marked, weekends excluded How to use →
- NewExport the monthly attendance report as PDF or Excel How to use →
- NewExport petty cash records to Excel, choosing the format before you export How to use →
- ImprovedStronger account security — sign out other devices from settings; deactivating a member takes effect immediately
v1.1.02026.06.27
See your schedule and check in without opening the app
- NewHome screen widgets on iOS and Android: calendar and one-tap check-in without opening the app How to use →
- NewiOS Live Activity: after clocking in, a countdown to your next appointment that rolls on automatically How to use →
- NewApple Watch app: check in from your wrist, add to-dos and log expenses by voice How to use →
- NewApple Watch complication: check-in status and today’s to-dos right on the watch face How to use →
- NewControl Center quick check-in on iOS and Quick Settings tiles on Android How to use →
- ImprovedWidget calendar now uses colour-coded dots so to-dos, shifts and Google events are easy to tell apart
v1.0.32026.06.19
Let crew without an email address sign in easily
- NewNo email needed — admins can create accounts with a phone number How to use →
- ImprovedAdjustable text size, with a live preview slider in Settings
- ImprovedTap a calendar to-do to edit it; new items appear instantly
v1.0.22026.06.17
Easier to read, even for tired eyes
- ImprovedLarger text across the app for better readability
- FixedFixed text being clipped in several dialogs
v1.0.12026.06.16
Faster login and sign-up
- ImprovedAdded one-tap LINE login
- FixedFixed the verification-code screen not appearing during sign-up
v1.0.02026.06.16
Everywhere Design is hereReleased
- NewOfficially launched on both the iOS App Store and Google Play
- NewScheduling, GPS check-in, QC photos, vendor database, to-do lists, monthly reports How to use →
- NewAvailable in Traditional Chinese, English, Japanese, Korean and more
Start free
Put your job sites in your pocket today
30-day free trial, no credit card. Works on iPhone, Android and computer.